Date
2014 to 2015
Client
Ville de Montpellier
Amount
542 000 € HT
Team
RL&A Architectes, architect
Typology
Bridges and fountains
Vialleton bridge - Montpellier (34)
Restoration
The Vialleton Bridge, built in 1692, had for a long time already been infiltrated with water, causing resurgences in the arches raised successively between the 17th and the 19th centuries. In addition, the passage of cars under the bridge caused a serious deterioration.
Entrusted to RL&A, the project management has recommended waterproofing works. Also the restoration of the arches of the bridge was carried out.
/ Listed as a National Landmark